Drainage Contractors Bolton, Liverpool, Wigan and Warrington
North West Environmental Services North West Environmental Services North West Environmental Services North West Environmental Services North West Environmental Services

Altrincham Project

Problem: Site discharging water/cement mixture into nearby canal by mistake. Canal had build up of cement residue around outfall pipe. United Utilities wanted site to discharge into nearby foul line but only after water/cement mixture had been treated through a three stage interceptor. Clients also wanted to be able to recycle as much water as possible.

Answer: A 15000 Litre three stage interceptor trap was designed specifically for the site with a 4th tank fitted downstream with a pumping system which allows the filtered water to outfall to the foul line or be pumped back to a holding tank on site. Consent to discharge was obtained, the output water quality has exceeded all targets, and the site has surpassed its targets for using recycled water.

 

Gallery

Below are a few pictures of our work from this project.

 

 

No Callout Charge | 24 Hour Service | Fast and Reliable Local Business
Call Us Now !
Call Us: 0800 034 1965

Copyright © 2009 North West Environmental Services - Drainage Contractors Wigan and Warrington, Bolton and Liverpool
Head Office: Unit 23 Standish Court, Bradley Hall Trading Estate, Standish, Lancashire - WN6 0XQ
Tel: 0800 034 1965
Fax: 01257 427707